Eight knitwear factories in China, compared on the figures each one publishes. Every supplier in this table runs its own knitting floor. None of them is a marketplace, a trading company or a sourcing agent, because those are not equivalents: a platform lists factories, it does not knit.
The point of the comparison is to make the differences visible before you send a tech pack. Figures were taken from each company’s own website and checked on 18 November 2026. Where a supplier does not publish a number, the table says not published — that is not a judgement on their capability, only a statement about what a buyer can verify without asking.
Commercial terms: what each factory publishes
| Supplier | Published MOQ | Sampling | Bulk lead time | Certifications listed |
|---|---|---|---|---|
| Cogarm (this site) | 100 pcs per style and colourway | 7–14 days | 30–45 days | OEKO-TEX, WRAP, ISO 9001 |
| KnitSeek | 100 pcs per style | 7–10 days | 25–45 days | BSCI and WRAP verified at factory level; OEKO-TEX and GRS documents apply to specific sites or orders, not the whole plant |
| Guoou Fashion | 300 pcs per style (100 pcs per colour) | Not published | Not published | Not listed on the page reviewed |
| MySweaterFactory | From 50 pcs | Not published | Not published | “Eco-certified” without a standard named |
| YouTricot | From 50 pcs on selected stock-yarn programmes | Not published | Not published | Not listed on the page reviewed |
| Lin Sweater | 300 pcs per style | 7–10 days for the first sample | 18–25 days | OEKO-TEX |
| Kaida Knitwear | 100–200 pcs per style | 7–12 days | 30–40 days after sample approval | OEKO-TEX 100, GRS, RWS, BCI, BSCI |
| JM Sweater | 50 pcs per style per colour | 7–15 working days for pre-production samples | Not published | GRS, BSCI, WRAP, ISO 9001, OEKO-TEX, Sedex SMETA |
Production profile: where and how they make it
| Supplier | Based in | Founded | Published footprint | Gauge range stated |
|---|---|---|---|---|
| Cogarm | Dongguan, Guangdong (Dalang and Humen plants) | 2006 | 300+ computerised knitting machines, 200+ sewing machines | 3GG–18GG |
| KnitSeek | Not stated on site | “20+ years”, no year given | Factory up to 5,000 m², capacity up to 3 million pieces a year | Not stated |
| Guoou Fashion | Dalang, Dongguan | 2013 | Not published as figures; describes in-house knitting, linking, hand finishing and testing lab | 3GG–18GG |
| MySweaterFactory | Not stated on site (positions itself for the Australian market) | 1994 | 15,000 m², 200 staff | 3GG–18GG |
| YouTricot | Dalang, Dongguan | Not stated (linked factory established 2009) | 80 STOLL machines added in May 2026, 50 of them at 12 gauge; Shima Seiki for seamless and fine gauge | Chunky, midweight and fine gauge described, no range published |
| Lin Sweater | Dalang, Dongguan | 1996 | 120+ skilled workers, 40+ flat knitting machines | Fine gauge to chunky described, no range published |
| Kaida Knitwear | Tongxiang, Zhejiang | 1983 | 10,000+ m², 300+ machines, 200+ staff | Not stated |
| JM Sweater | Guangzhou, Guangdong | 2004 | 3,000 m², 110 machines, 1.2 million pieces a year | Not stated |
Sources: each supplier’s own website, reviewed 18 November 2026. Gauge, capacity and certification claims are reproduced as published, not verified by inspection. Send corrections with a link and we will update the table.
What the two tables actually tell you
- MOQ is the least useful filter. Published minimums run from 50 to 300 pieces, a six-fold spread, and the lowest figures usually attach to a stock-yarn programme rather than to a fully custom yarn. What decides your cost is not the minimum, it is how many styles and colourways you spread across it.
- Lead time is where the real spread sits. Where a factory publishes bulk timing, the range is 18 to 45 days. On a seasonal knit programme that gap is the difference between a delivery window and air freight. Three of the eight do not publish a bulk time at all, which is itself information: ask for it in writing before you plan a launch.
- Gauge claims are easy to state and easy to check. Four of the eight publish a 3GG–18GG range. Ask for the machine list by gauge, because a plant can own one 18GG machine and still describe itself as fine-gauge capable.
- Certification wording separates the careful from the loose. Two suppliers name exact standards and scopes; one says “eco-certified” with no standard; two list nothing on the page reviewed. The wording matters more than the logo.
How to verify a certification claim in four steps
- Ask for the certificate, not the logo. Every credible scheme issues a document with a number, a licence holder and an expiry date.
- Match the site name on the certificate to the site that will run your order. Group certificates often cover one plant; a sister factory in the same group is not automatically covered.
- Check the scope. OEKO-TEX covers materials tested for harmful substances, not social compliance; WRAP and BSCI cover labour practices, not fabric chemistry. They answer different questions.
- Verify with the issuing body. OEKO-TEX, amfori BSCI and WRAP all publish certificate lookups. This applies to us as much as to anyone in the table.
What a comparison table cannot tell you
Published numbers filter the list; they do not choose the supplier. Three things decide the outcome and none of them appear in a table:
- Sample quality against a written spec. Commission a paid sample in your yarn and finishing, and judge it against measurements rather than a photograph.
- Capacity allocation in your season. Ask which machines are dedicated to your order, and what happens to it when another client’s bulk runs late. A factory that answers with dates is different from one that answers with reassurance.
- Response speed during sampling. The cadence you experience before the deposit is the cadence you will get during production.
Where Cogarm fits
Our published terms are 100 pieces per style and colourway, sampling in 7–14 days, bulk in 30–45 days, a 3GG–18GG range across two Dongguan plants, and OEKO-TEX, WRAP and ISO 9001 certification. That places us mid-table on MOQ and mid-table on lead time.
Two honest caveats. If your programme needs 50-piece stock-yarn runs, YouTricot and MySweaterFactory publish lower minimums than ours. If you need bulk in under 25 days, Lin Sweater publishes 18–25 days and we do not. Where we are strongest is the combination: a mixed-gauge range under one roof, knit and woven in the same group, and a documented sampling process.
Related sourcing guides
- Knit vs woven garment sourcing — how the two production systems differ in MOQ, cost and defect profile.
- Fabric sourcing for garment buyers — the specification fields and tests that decide whether bulk is accepted.
- Fully fashioned vs cut and sew — which knitting method fits your style, and what each costs.
- Knitwear manufacturers in Europe — if you are weighing a European supplier against a Chinese one.
Frequently asked questions
Is the published MOQ negotiable?
Sometimes, but rarely in the way buyers hope. A factory can spread a minimum across colourways, or accept a lower first order against a committed repeat. Asking “what would make 50 pieces work” gets a more useful answer than asking for a discount on the minimum.
Why do some factories not publish lead times?
Usually because capacity is seasonal and a single number would be misleading, occasionally because the number is uncompetitive. Either way, treat “not published” as a question to ask rather than a reason to exclude.
Can I verify certificates before placing a sample order?
Yes, and you should. Certificate number, licence holder, site and expiry date can be checked with OEKO-TEX, amfori or WRAP directly, without the supplier’s involvement.
